Wednesday, June 26, 2013

portable run

I made a portable run for the ladies so I can take them out for a walk. While getting them in the first time was traumatic for all, they really like it - scratching up a storm. Meggie likes it, too.

Wednesday, June 5, 2013

bricks!

 


 I replaced all of the wooden edging with landscape bricks, added some beds around bushes, made some small terraces and patios, etc. Glad the weather wasn't all that hot.

Wednesday, May 15, 2013

Daisy's foot & Meggie's tail

Daisy ran into Jane's foot (?!) and got a hairline fracture in her toe on the right foot. She needs a cast for a week. Meggie ran into somebody out in the forest one night and had three, one inch long gashes on the base of her tail. The vet cleaned it up and gave her antibiotics. Everybody is recuperating just fine.

Friday, April 19, 2013

workroom ceiling

I finished the ceiling in my workroom downstairs. One of the main reasons for putting in these ceilings in the basement is to equalize the temperature and therefore humidity on either side of the wood floors above these rooms to minimize cupping. Hope this helps. At least it looks nice.

Saturday, April 13, 2013

Jane's new workrooms

 We reorganized Jane's workroom upstairs (left) allowing for two large work areas. The table on the left is for sewing, yet a new hobby, and the other one is for cutting, assembly, etc. The computer table is now the small one previously used for the sewing machine. Her downstairs workroom (right) is now complete with a new painting table for floor cloths and the like (has an easily cleaned surface), drop down ceiling (with four banks of energy efficient T8 lights), and even two heating vents (cutting into the existing line for only two more vents should not affect heating in the rooms above). Both rooms are quite nice.

Saturday, April 6, 2013

springtime might be coming (finally)

Today was just beautiful. It has been a while so we all appreciated it. Even got the two mowers re-attached and mowed the backyard. The pond pump is back in, and we hung Jane's new painted quilt for the red shed. I had hoped to get in the garden to till it up and fertilize, but it is just too wet. I would do more damage than good right now. It is a very late spring.

Sunday, March 17, 2013

editing songs



For the last couple weeks, I have been taking the handwritten songs for our contradance band and putting them into a nice music software package called Sibelius. Upper left is an example of the original and bottom left is the Sibelius version. Then I simplified them (example bottom right). The reason I did this (on 250 songs) is that there is no way I can play them at the dance pace of 120 beats per minute. Take a look at the original example. That's a lot of notes given that we are now hitting two per beat in some cases making it 240, or 4 notes per second! Turns out that you typically only need to make a few, but critical, changes to make these play-able (bottom right to left comparison). All of the originals are input and about the simplified versions will be done this week. I put in the originals since I anticipate changes to the simplified versions as time goes on. They are easier to read as well, but a minor point when considering inputting 250 songs!