Wednesday, June 26, 2013
portable run
Wednesday, June 5, 2013
bricks!
Wednesday, May 15, 2013
Daisy's foot & Meggie's tail
Friday, April 19, 2013
workroom ceiling
I finished the ceiling in my workroom downstairs. One of the main reasons for putting in these ceilings in the basement is to equalize the temperature and therefore humidity on either side of the wood floors above these rooms to minimize cupping. Hope this helps. At least it looks nice.
Saturday, April 13, 2013
Jane's new workrooms
Saturday, April 6, 2013
springtime might be coming (finally)
Today was just beautiful. It has been a while so we all appreciated it. Even got the two mowers re-attached and mowed the backyard. The pond pump is back in, and we hung Jane's new painted quilt for the red shed. I had hoped to get in the garden to till it up and fertilize, but it is just too wet. I would do more damage than good right now. It is a very late spring.
Sunday, March 17, 2013
editing songs
For the last couple weeks, I have been taking the handwritten songs for our contradance band and putting them into a nice music software package called Sibelius. Upper left is an example of the original and bottom left is the Sibelius version. Then I simplified them (example bottom right). The reason I did this (on 250 songs) is that there is no way I can play them at the dance pace of 120 beats per minute. Take a look at the original example. That's a lot of notes given that we are now hitting two per beat in some cases making it 240, or 4 notes per second! Turns out that you typically only need to make a few, but critical, changes to make these play-able (bottom right to left comparison). All of the originals are input and about the simplified versions will be done this week. I put in the originals since I anticipate changes to the simplified versions as time goes on. They are easier to read as well, but a minor point when considering inputting 250 songs!
Subscribe to:
Posts (Atom)

