Friday, April 19, 2013

workroom ceiling

I finished the ceiling in my workroom downstairs. One of the main reasons for putting in these ceilings in the basement is to equalize the temperature and therefore humidity on either side of the wood floors above these rooms to minimize cupping. Hope this helps. At least it looks nice.

Saturday, April 13, 2013

Jane's new workrooms

 We reorganized Jane's workroom upstairs (left) allowing for two large work areas. The table on the left is for sewing, yet a new hobby, and the other one is for cutting, assembly, etc. The computer table is now the small one previously used for the sewing machine. Her downstairs workroom (right) is now complete with a new painting table for floor cloths and the like (has an easily cleaned surface), drop down ceiling (with four banks of energy efficient T8 lights), and even two heating vents (cutting into the existing line for only two more vents should not affect heating in the rooms above). Both rooms are quite nice.

Saturday, April 6, 2013

springtime might be coming (finally)

Today was just beautiful. It has been a while so we all appreciated it. Even got the two mowers re-attached and mowed the backyard. The pond pump is back in, and we hung Jane's new painted quilt for the red shed. I had hoped to get in the garden to till it up and fertilize, but it is just too wet. I would do more damage than good right now. It is a very late spring.